MANCHESTER 173 AT MORLEY, 2 August 2014

The visit to Morley went very well despite some proper Pennine weather.   On the Friday  (Yorkshire Day) a group of volunteers from Heaton Park loaded the tram onto a Gillespie's low loader in the pouring rain.

OLYMPUS DIGITAL CAMERAThe next morning it was taken over the hills to Morley

OLYMPUS DIGITAL CAMERAArriving at 7.50am.  It was then positioned in Peel Street with a poster in front of it showing the original recruiting tram.

OLYMPUS DIGITAL CAMERADuring the day it was used as an impromptu stage for two singers performing a medley of WWI era songs.

OLYMPUS DIGITAL CAMERAAnd the Mayor of Morley was photographed on the platform of the tram, in between rain showers.

OLYMPUS DIGITAL CAMERAWe were rather dissapointed as Leeds City Council rescinded permission to park the tram next to the Town hall, at the last minute.  However we were able to see the Town hall from where we were parked.

OLYMPUS DIGITAL CAMERAThen just after 4pm  the tractor unit was re-coupled and reversed carefully down Peel Steet then turned around for the journey home.

OLYMPUS DIGITAL CAMERAArriving at Heaton Park about an our later the ramp was quickly built and the careful journey back to home rails began.

OLYMPUS DIGITAL CAMERAThe final part of the ramp consisted of two taper pieces specially made that week after a design conference over the telephone.  These had two pegs on their inside faces that  held the rails to gauge and ensured that the wheels came correctly onto the track.

OLYMPUS DIGITAL CAMERAThen finally at 18.02, less than 3 hours after the tram left Peel Street in Morley it was back on home rails.

OLYMPUS DIGITAL CAMERAI hope it won't be another 79 years before a tram comes to Morley again but don't hold your breath.

A grateful thanks to all the hard working volunteers at Heaton Park for making this possible and LTHS member Dennis Marshall for coming up with the idea.

 

A TRAM RETURNS TO MORLEY AFTER 79 YEARS

WW1 LCT Recruiting Tram. r79 years ago on 23rd January 1935 the last tram ran along Queen Street in Morley.  It was heading from Worrall Street depot to Swinegate depot in Leeds following the closure of the Morley Corporation tram system the night before.  Now for one day only a tram is to return to Morley.

On 2nd August 2014 an event is going to be held on Queen Street in Morley to commemorate the outbreak of the First World War.

In the First World War many cities ran specially decorated trams to help with recruiting efforts.  Leeds had one that toured the city with the destination reading 'Berlin'.

Thanks to the efforts of Morley Chamber of Trade, The LTHS and the Manchester Tramway Museum Society (The MTMS)  at Heaton Park a replica of a recruiting tram is going to be in Queen Street in  Morley on Saturday 2nd August.  Manchester 173, an open topped double decker is being specially decorated to look like a recruitingOLYMPUS DIGITAL CAMERA tram and is then being loaded onto a low loader and brought to Morley where it will be parked in Windsor Court on Queen Street as the centre piece of the Remembrance Commemoration from 10am to 4pm.  It will then return to Heaton Park, still decorated and may well be used at an event there in September.

UPDATE  29-7-14.   THE TRAM WILL NOW BE POSITIONED ON PEEL STREET AT ITS JUNCTION WITH QUEEN STREET.

The LTHS would like to express their gratitude to the MTMS and Morley Chamber of Trade for their hard work in helping this to happen.

Progress with Cambridge 7 – 15th March 2014

The running gear for Cambridge 7 was collected from Leeds by a team from the Ipswich Transport Museum on Wednesday 12th March.   This marked the very successful completion of a project for the LTHS with a complete new set of running gear for a horse tram delivered in just over 6 months.  The LTHS would like to acknowledge the help and cooperation of the staff at the Middleton Railway, who machined some of the parts, used their rail mounted crane to move the wheelsets and completed running gear, and also allowed the LTHS to complete the work in their workshops. Without this cooperation the project would not have been possibe.

The running gear was taken back to Ipswich that afternoon and was successsfully taken through the museum, turned and positioned alongside the body of Cambridge 7.  It is planned to fit the running gear to the body in a few months time.

Here the complete Runing Gear is shown outside the Engine House building at the extreme end of the short length of 4 foot gauge track prior to being lifted. The lower tie bars are only temporarily secured so that they can be drilled when the gear has been fitted to the original underframe.

140312 COMPLETE

The gear was then carefully lifted and taken down to where the lorry was waiting and placed on some temporary wooden track for its jouney to Ipswich.

140312 Loaded

 

Progress with Cambridge 7 – 8th March 2014.

Well today was a hard but good day.  We started with a pile of parts and ended with a complete set of running gear complete with brakes.  And it runs, though there is only 6' of track at the moment.

At 9.45 the wheelsets were delivered from Multitech of Ferrybridge.

Here the wheelsets have just arrived.

OLYMPUS DIGITAL CAMERA

The crew from the Middleton Railway arrived with the crane and the first pair were lowered onto the ground.  Up went the cry, "They're the wrong gauge.".


OLYMPUS DIGITAL CAMERA

OLYMPUS DIGITAL CAMERA

Then I went to set up the temporary 4' gauge track outside the Engine House.

OLYMPUS DIGITAL CAMERA

The first set of wheels then arrived.

OLYMPUS DIGITAL CAMERA

The crane slewed and they ere lowered carefully onto the temporary track.

OLYMPUS DIGITAL CAMERA

The crane then went back for the second set.

OLYMPUS DIGITAL CAMERA

Before long the second set of wheels appeared and they were then slowly rolled into the Engine House.

OLYMPUS DIGITAL CAMERA

The dummy underframe was then lifted onto the trestles positioned by the wheels.

OLYMPUS DIGITAL CAMERA

The various parts were then laid out ready for the assembly to begin.

OLYMPUS DIGITAL CAMERAOLYMPUS DIGITAL CAMERA

The four suspension units were then attached along with all the springs, dampers and various collars and spring seats.

OLYMPUS DIGITAL CAMERA

After lunch the sway bar was attached and work began on fitting the brake gear.

OLYMPUS DIGITAL CAMERA

A couple of small items of machining needed to be done but by 4.30 the whole unit had been assembled and the brakes tested.  The cross beams are in but the tie bars have not been drilled at this stage so they hang below the axleboxes.

OLYMPUS DIGITAL CAMERA

All in all a good days work. Now just get the wheels and axles painted and the brake springs fitted and it's ready for delivery.

Progress with Cambridge 7 6th March 2014

On Wednesday we were hoping to take delivery of the wheels but for various reasons they didn't appear so I spent the day with Jim Soper painting and drilling the last of the steelwork that I had collected the day before.  At lunchtime Tony and John arrived from Ipswich with the dummy underframe on which the running gear is to be assembled. It was good to see them and various things were sorted out.

On Thursday Malcolm and I did the final machining and drilling on the steelwork and by lunchtime a nice pile of painted and drilled pieces had been assembled.

OLYMPUS DIGITAL CAMERA

Also the two tie bars that will connect the bottoms of the axleboxes had been painted but not drilled.  That will be done in Ipswich to suit the actual underframe.

OLYMPUS DIGITAL CAMERA

Here they are propped against the door.

Progress with Cambridge 7 – 27th February 2014

Another good work day was held and a lot achieved. During the week I had taken delivery of the 8 coil springs from the Lancashire Spring Co at Milnrow, in Lancashire (Yes I did have to travel to the dark side). I also collected various bit of steelwork from Jason Reeve. These are the two brake beams, the sway bar and the sway bar bracket. These together with the remaining three brake shoes were taken to Middleton. Malcolm spent the morning machining pivots for the pawls for the brake ratchets and I spent the morning drilling holes in the brake blocks. These weren't easy as they are a very awkward shape to clamp.

After lunch Malcolm made the pivot for the sway bar and I drilled the remaining holes in the sway bar. The pivot hole then needed milling to make it oval. Apparently this allows the brakes to self centre. Meanwhile I had ground some metal off the brake beams so that they fitted into the brake shoes then drilled the first beam. Here is a completed brake beam with the blocks temporarily bolted on.
OLYMPUS DIGITAL CAMERA
The brake blocks can be seen at either side plus the angled boss that allows the push rod to apply the brakes.
Once Malcolm had finished machining the parts for the sway bar it was test assembled with the pivot fitted.
OLYMPUS DIGITAL CAMERA
After that it was time to clear up but I couldn't resist adding two of the coil springs to the trial suspension unit. This now has both spring seats on it.
A lot of work is left but next week the wheelsets and dummy underframe are to be delivered so there should be a lot to report.